Red Bluff Express Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Red Bluff Express Pipeline is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2018.

Red Bluff Express Pipeline
General information
KindPipeline project[1]
Project typeNew build[1]
StatusIn service[1]
CommodityNatural gas[1]
Owner
Operator
StateTexas[1]
CountiesLoving, Pecos, Reeves[2]
In serviceMay 2018[1][3]
Contractors
Technical information
Length80 mi[1] or 82 mi[4][sources disagree]
Pipe size30", 36", 42"[1]
Capacity1400 MMcf/d additional capacity (EIA)[1][3]
On ProvenHand
Hands listed0

Red Bluff Express Pipeline is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2018.

Contractorsedit

ContractorWorkScopeYears
Pumpco, Inc.[5][6]Prime81.5 miles: 64.9 miles of 42-inch, 10.4 miles of 36-inch, 6.2 miles of 30-inch (Orla, TX to Coyanosa, TX); started with stick welding, finished with automatic welding1 November 2017 – 1 March 2018
Pumpco, Inc.[4]Prime65 miles of 42-inch, 10.4 miles of 36-inch and 6.2 miles of 30-inch pipeline, Coyanosa to Orla, Texas, built in 4 months

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Red Bluff Express Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Western Midstream Partners, LP quarterly report on Form 10-Q for the quarter ended March 31, 2019”. Western Midstream Partners, LP (filed with the SEC). 1 May 2019. Retrieved 4 October 2026.
  3. “Energy Transfer Partners reports second quarter 2018 results (Form 8-K, Exhibit 99.1)”. Energy Transfer Partners, L.P. (SEC filing). 8 August 2018. Retrieved 4 October 2026.
  4. “Red Bluff Express Pipeline in Texas (MasTec project page, archived copy; live page now returns 404)”. MasTec, Inc. Archived from the original on 12 January 2026. Retrieved 4 October 2026.
  5. “Red Bluff Express 42", 36", & 30" - Pumpco”. Pumpco, Inc. Archived from the original on 10 August 2020. Retrieved 3 October 2026.
  6. “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.