Roadrunner Gas Transmission phase 1

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Roadrunner Gas Transmission phase 1 is a natural gas pipeline in Texas, operated by Roadrunner Gas Transmission, LLC. It entered service in 2016.

Roadrunner Gas Transmission phase 1
General information
KindPipeline project[1]
Project typeNew build[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Part ofRoadrunner Gas Transmission Pipeline[3]
StateTexas[1][2]
Approved15 October 2015[1]
In service10 March 2016[2]
FERC docketCP15-161[1]
Technical information
Length0.2 mi[1] or 200 mi[2][sources disagree]
Pipe size30"[2]
Capacity875 MMcf/d (FERC project list)[1] or 170 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$133 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Roadrunner Gas Transmission phase 1 is a natural gas pipeline in Texas, operated by Roadrunner Gas Transmission, LLC. It entered service in 2016.

Crossings

FeatureMethod
Rio Grande[4]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 875 MMcf/d (FERC project list)[1]
  • 170 MMcf/d additional capacity (EIA)[2]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Roadrunner Gas Transmission phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Presidential Permit and Granting Authorization under Section 3 of the Natural Gas Act re Roadrunner Gas Transmission, LLC (CP15-161)”. Federal Energy Regulatory Commission. 15 October 2015. Retrieved 4 October 2026.
  4. “Supplemental Information to the Implementation Plan and Request for Notice to Proceed, border crossing facilities (CP15-161)”. Roadrunner Gas Transmission, LLC (filed with FERC). 7 January 2016. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.