Rover - North Coast Interconnect Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Rover - North Coast Interconnect Project is a natural gas pipeline lateral in Ohio, operated by Rover Pipeline LLC. Construction began in 2022. It runs 0 miles of 6" pipe.

Rover - North Coast Interconnect Project
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1][2]
CommodityNatural gas[1][3]
Operator
Owner and operator
StateOhio[1][3]
CountiesSeneca[3]
Approved22 April 2022[3]
Construction started3 August 2022[5]
In service16 December 2022[1] or 30 November 2022[2][sources disagree]
FERC docketCP21-474[1]
Technical information
Length0 mi[1]
Pipe size6"[1]
Capacity108 MMcf/d additional capacity (EIA)[1]
Cost$0.78 million (EIA estimate; no dollar year given)[1] or $776,396[3][sources disagree]
On ProvenHand
Hands listed0

Rover - North Coast Interconnect Project is a natural gas pipeline lateral in Ohio, operated by Rover Pipeline LLC. Construction began in 2022. It runs 0 miles of 6" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $0.78 million (EIA estimate; no dollar year given)[1]
  • $776,396[3]
In service
  • 16 December 2022[1]
  • 30 November 2022[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rover - North Coast Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Notice of Commencement of Service, Rover-North Coast Interconnect Project (CP21-474)”. Rover Pipeline LLC (filed with FERC). 30 November 2022. Retrieved 4 October 2026.
  3. “Order Issuing Certificate, Rover Pipeline LLC, North Coast Interconnect Project (CP21-474)”. Federal Energy Regulatory Commission. 22 April 2022. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP21-474”. Federal Energy Regulatory Commission. 20 July 2021. Retrieved 3 October 2026.
  5. “First Biweekly Construction and Environmental Status Report (period ending 08/10/2022), Rover-North Coast Interconnect Project (CP21-474)”. Rover Pipeline LLC (filed with FERC). 10 August 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.