Rover - North Coast Interconnect Project
From the ProvenHand pipeline wiki
Rover - North Coast Interconnect Project is a natural gas pipeline lateral in Ohio, operated by Rover Pipeline LLC. Construction began in 2022. It runs 0 miles of 6" pipe.
| Rover - North Coast Interconnect Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1][2] |
| Commodity | Natural gas[1][3] |
| Operator | |
| Owner and operator | |
| State | Ohio[1][3] |
| Counties | Seneca[3] |
| Approved | 22 April 2022[3] |
| Construction started | 3 August 2022[5] |
| In service | 16 December 2022[1] or 30 November 2022[2][sources disagree] |
| FERC docket | CP21-474[1] |
| Technical information | |
| Length | 0 mi[1] |
| Pipe size | 6"[1] |
| Capacity | 108 MMcf/d additional capacity (EIA)[1] |
| Cost | $0.78 million (EIA estimate; no dollar year given)[1] or $776,396[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Rover - North Coast Interconnect Project is a natural gas pipeline lateral in Ohio, operated by Rover Pipeline LLC. Construction began in 2022. It runs 0 miles of 6" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rover - North Coast Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Rover-North Coast Interconnect Project (CP21-474)”. Rover Pipeline LLC (filed with FERC). 30 November 2022. Retrieved 4 October 2026.
- “Order Issuing Certificate, Rover Pipeline LLC, North Coast Interconnect Project (CP21-474)”. Federal Energy Regulatory Commission. 22 April 2022. Retrieved 4 October 2026.
- “FERC eLibrary docket CP21-474”. Federal Energy Regulatory Commission. 20 July 2021. Retrieved 3 October 2026.
- “First Biweekly Construction and Environmental Status Report (period ending 08/10/2022), Rover-North Coast Interconnect Project (CP21-474)”. Rover Pipeline LLC (filed with FERC). 10 August 2022. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.