Rover – Wick Meter Downsize Project
From the ProvenHand pipeline wiki
Rover – Wick Meter Downsize Project is a pipeline project, operated by Rover Pipeline LLC. It was built and entered service in 2025.
| Rover – Wick Meter Downsize Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Owner and operator | |
| Counties | Tyler[3] |
| Approved | 21 November 2024[3] |
| Construction started | 6 March 2025[2] |
| In service | 6 March 2025[2] |
| FERC docket | CP24-504[1] |
| Technical information | |
| Cost | estimates the cost ... to be $503,709, reimbursed by Eureka[3] |
| On ProvenHand | |
| Hands listed | 0 |
Rover – Wick Meter Downsize Project is a pipeline project, operated by Rover Pipeline LLC. It was built and entered service in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rover – Wick Meter Downsize Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-504”. Federal Energy Regulatory Commission. 25 July 2024. Retrieved 3 October 2026.
- “Notification of construction and in-service, Wick Meter Downsize Project (CP24-504)”. Rover Pipeline LLC (filed with FERC). 7 March 2025. Retrieved 4 October 2026.
- “Order Issuing Certificate, Wick Meter Downsize Project (CP24-504)”. Federal Energy Regulatory Commission. 21 November 2024. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.