Rover–Berne Meter Station Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Rover–Berne Meter Station Expansion Project is a pipeline expansion in Ohio, operated by Rover Pipeline LLC. It was built and entered service in 2025.
| Rover–Berne Meter Station Expansion Project | |
|---|---|
| Also called | Rover – Berne Meter Station Expansion Project[1] |
| General information | |
| Project type | Expansion[1] |
| Status | In service[2] |
| Owner and operator | |
| State | Ohio[3] |
| Counties | Monroe[4] |
| Approved | 30 October 2024[3][4] |
| Construction started | 5 February 2025[2] |
| In service | 8 February 2025[2] |
| FERC docket | CP24-496[1] |
| Technical information | |
| Capacity | 50 MMcf/d (FERC project list)[3] or receipt of an additional 50,000 Dth/d[4][sources disagree] |
| Cost | approximately $950,000, reimbursed by Blue Racer[4] |
| On ProvenHand | |
| Hands listed | 0 |
Rover–Berne Meter Station Expansion Project is a pipeline expansion in Ohio, operated by Rover Pipeline LLC. It was built and entered service in 2025.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rover–Berne Meter Station Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-496”. Federal Energy Regulatory Commission. 18 July 2024. Retrieved 3 October 2026.
- “Notice of Construction, Berne Meter Station Expansion Project (CP24-496)”. Rover Pipeline LLC (filed with FERC). 10 February 2025. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate, Berne Meter Station Expansion Project (CP24-496)”. Federal Energy Regulatory Commission. 30 October 2024. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.