Rover–Brightmark Receipt and Delivery Meter Station Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Rover–Brightmark Receipt and Delivery Meter Station Project is a natural gas pipeline lateral in Michigan, operated by Rover Pipeline LLC. It entered service in 2022. It runs 0 miles of 2" pipe.

Rover–Brightmark Receipt and Delivery Meter Station Project
Also calledRover - Brightmark Receipt and Delivery Meter Station Project[1]
General information
KindPipeline project[2]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
Owner and operator
StateMichigan[2][3]
CountiesLenawee[3]
In service2 October 2022[2]
FERC docketCP21-492[2]
Technical information
Length0 mi[2]
Pipe size2"[2]
Capacity1.6 MMcf/d additional capacity (EIA)[2]
Cost$1.6 million (EIA estimate; no dollar year given)[2] or $1,662,811 (Rover estimate, 2021 application)[3][sources disagree]
On ProvenHand
Hands listed0

Rover–Brightmark Receipt and Delivery Meter Station Project is a natural gas pipeline lateral in Michigan, operated by Rover Pipeline LLC. It entered service in 2022. It runs 0 miles of 2" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $1.6 million (EIA estimate; no dollar year given)[2]
  • $1,662,811 (Rover estimate, 2021 application)[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rover–Brightmark Receipt and Delivery Meter Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP21-492”. Federal Energy Regulatory Commission. 9 September 2021. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Applications, Rover Pipeline LLC, Rover-Brightmark Receipt and Delivery Meter Station Project (CP21-492)”. FERC (public notice, eLibrary). 20 September 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.