Rover–Bulger CS and Harmon Creek MS Expansion Project is a natural gas pipeline expansion in Pennsylvania, operated by Rover Pipeline LLC. Construction began in 2025 and the line entered service in 2026.
| Rover–Bulger CS and Harmon Creek MS Expansion Project | |
|---|---|
| Also called | Rover-Bulger CS and Harmon Creek MS Expansion[1], Rover Pipeline LLC's Rover–Bulger CS and Harmon Creek MS Expansion Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | Under construction[2] or In service[3][sources disagree] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Pennsylvania[2][4][5] |
| Counties | Washington[6] |
| Approved | 19 September 2025[4][6] |
| Construction started | 1 December 2025[7] |
| In service | 1 June 2026[3] |
| FERC docket | CP25-12[1] |
| Technical information | |
| Capacity | 400 MMcf/d (FERC project list)[2][4][5] |
| Units added | 1 × CAT 3608 / Ariel JGC4 (gas engine driving a reciprocating compressor, 2,750 hp each)[8] |
| Horsepower added | 2,750 hp[8] |
| Cost | $22 million (EIA estimate; no dollar year given)[2] or approximately $21,995,477[6][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Rover–Bulger CS and Harmon Creek MS Expansion Project is a natural gas pipeline expansion in Pennsylvania, operated by Rover Pipeline LLC. Construction began in 2025 and the line entered service in 2026.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| Status |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rover–Bulger CS and Harmon Creek MS Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-12”. Federal Energy Regulatory Commission. 31 October 2024. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Rover-Bulger CS and Harmon Creek MS Expansion Project (CP25-12)”. Rover Pipeline LLC (filed with FERC). 2 June 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate, Rover Pipeline LLC, Rover-Bulger CS and Harmon Creek MS Expansion Project (CP25-12)”. Federal Energy Regulatory Commission. 19 September 2025. Retrieved 3 October 2026.
- “Monthly Construction and Environmental Status Report No. 1 (period ending 12/31/2025), Rover-Bulger CS and Harmon Creek MS Expansion Project (CP25-12)”. Rover Pipeline LLC (filed with FERC). 2 January 2026. Retrieved 3 October 2026.
- “Environmental Assessment, Rover-Bulger Compressor Station and Harmon Creek Meter Station Expansion Project (CP25-12)”. Federal Energy Regulatory Commission. 25 June 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.