Rover–Bulger CS and Harmon Creek MS Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Rover–Bulger CS and Harmon Creek MS Expansion Project is a natural gas pipeline expansion in Pennsylvania, operated by Rover Pipeline LLC. Construction began in 2025 and the line entered service in 2026.

Rover–Bulger CS and Harmon Creek MS Expansion Project
Also calledRover-Bulger CS and Harmon Creek MS Expansion[1], Rover Pipeline LLC's Rover–Bulger CS and Harmon Creek MS Expansion Project[1]
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusUnder construction[2] or In service[3][sources disagree]
CommodityNatural gas[2]
Owner and operator
StatePennsylvania[2][4][5]
CountiesWashington[6]
Approved19 September 2025[4][6]
Construction started1 December 2025[7]
In service1 June 2026[3]
FERC docketCP25-12[1]
Technical information
Capacity400 MMcf/d (FERC project list)[2][4][5]
Units added1 × CAT 3608 / Ariel JGC4 (gas engine driving a reciprocating compressor, 2,750 hp each)[8]
Horsepower added2,750 hp[8]
Cost$22 million (EIA estimate; no dollar year given)[2] or approximately $21,995,477[6][sources disagree]
On ProvenHand
Hands listed0

Rover–Bulger CS and Harmon Creek MS Expansion Project is a natural gas pipeline expansion in Pennsylvania, operated by Rover Pipeline LLC. Construction began in 2025 and the line entered service in 2026.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $22 million (EIA estimate; no dollar year given)[2]
  • approximately $21,995,477[6]
Status
  • Under construction[2]
  • In service[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rover–Bulger CS and Harmon Creek MS Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-12”. Federal Energy Regulatory Commission. 31 October 2024. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Rover-Bulger CS and Harmon Creek MS Expansion Project (CP25-12)”. Rover Pipeline LLC (filed with FERC). 2 June 2026. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  6. “Order Issuing Certificate, Rover Pipeline LLC, Rover-Bulger CS and Harmon Creek MS Expansion Project (CP25-12)”. Federal Energy Regulatory Commission. 19 September 2025. Retrieved 3 October 2026.
  7. “Monthly Construction and Environmental Status Report No. 1 (period ending 12/31/2025), Rover-Bulger CS and Harmon Creek MS Expansion Project (CP25-12)”. Rover Pipeline LLC (filed with FERC). 2 January 2026. Retrieved 3 October 2026.
  8. “Environmental Assessment, Rover-Bulger Compressor Station and Harmon Creek Meter Station Expansion Project (CP25-12)”. Federal Energy Regulatory Commission. 25 June 2025. Retrieved 3 October 2026.