Rover–Iron Bank Meter Downsize Project
From the ProvenHand pipeline wiki
Rover–Iron Bank Meter Downsize Project is a pipeline project, operated by Rover Pipeline LLC.
| Rover–Iron Bank Meter Downsize Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | Approved[2] |
| Owner and operator | |
| Counties | Marshall[2] |
| Approved | 30 July 2025[2] |
| FERC docket | CP25-500[1] |
| Technical information | |
| Cost | approximately $277,080, reimbursed by EQT[2] |
| On ProvenHand | |
| Hands listed | 0 |
Rover–Iron Bank Meter Downsize Project is a pipeline project, operated by Rover Pipeline LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rover–Iron Bank Meter Downsize Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-500”. Federal Energy Regulatory Commission. 23 May 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate, Rover-Iron Bank Meter Downsize Project (CP25-500)”. Federal Energy Regulatory Commission. 30 July 2025. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.