Ryckman Creek Lateral Loop Project
From the ProvenHand pipeline wiki
Ryckman Creek Lateral Loop Project is a natural gas pipeline lateral in Wyoming, operated by Northwest Pipeline LLC. Construction began in 2026. It runs 6.8 miles of 12" pipe.
| Ryckman Creek Lateral Loop Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | Proposed[1] or Under construction[2][sources disagree] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Wyoming[1] |
| Counties | Uinta[3] |
| Approved | February 2026[4] |
| Construction started | July 2026[2] |
| FERC docket | CP26-18[5] |
| Technical information | |
| Length | 6.8 mi[1][5] |
| Pipe size | 12"[1][5] |
| Capacity | 30 MMcf/d additional capacity (EIA)[1] or incremental 30,278 Dth/day of firm transportation to and from the Double D Meter Station[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Ryckman Creek Lateral Loop Project is a natural gas pipeline lateral in Wyoming, operated by Northwest Pipeline LLC. Construction began in 2026. It runs 6.8 miles of 12" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Status |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ryckman Creek Lateral Loop Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly Environmental Report No. 1 (07/27/2026 to 08/01/2026), Ryckman Creek Loop Project (CP26-18)”. Northwest Pipeline LLC (filed with FERC). 6 August 2026. Retrieved 3 October 2026.
- “Application for a Certificate (prior notice), Ryckman Creek Loop Project (CP26-18), Northwest Pipeline LLC”. Federal Energy Regulatory Commission (eLibrary filing). 3 November 2025. Retrieved 3 October 2026.
- “Williams Form 10-Q for the quarter ended June 30, 2026 (MD&A, Power Express)”. The Williams Companies, Inc. 3 August 2026. Retrieved 3 October 2026.
- “Ryckman Creek Lateral Loop Project”. Williams (Northwest Pipeline). Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.