Sabal Trail Project Phase I
From the ProvenHand pipeline wiki
Sabal Trail Project Phase I is a natural gas pipeline in Alabama, Florida and Georgia, operated by Spectra Energy Corp/NextEra Energy/Duke Energy. It entered service in 2017. It runs 516.2 miles of 36" pipe.
| Sabal Trail Project Phase I | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| States | Alabama, Florida, Georgia[1] |
| Approved | 2 February 2016[2] |
| In service | 7 June 2017[1] |
| FERC docket | CP15-17[1] |
| FERC pre-filing docket | PF14-1[1] |
| Technical information | |
| Length | 516.2 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 830 MMcf/d additional capacity (EIA)[1] |
| Cost | $3200 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Sabal Trail Project Phase I is a natural gas pipeline in Alabama, Florida and Georgia, operated by Spectra Energy Corp/NextEra Energy/Duke Energy. It entered service in 2017. It runs 516.2 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sabal Trail Project Phase I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP15-17: Order issuing certificates and approving abandonment re Florida Southeast Connection, LLC”. Federal Energy Regulatory Commission. 2 February 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.