Sabal Trail Project Phase III is a natural gas pipeline expansion in Alabama, Florida and Georgia, operated by Sabal Trail Transmission.
| Sabal Trail Project Phase III | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | Approved[1] |
| Commodity | Natural gas[1] |
| Operator | |
| States | Alabama, Florida, Georgia[1] |
| FERC docket | CP15-17[1] |
| FERC pre-filing docket | PF14-1[1] |
| Technical information | |
| Capacity | 76 MMcf/d additional capacity (EIA)[1] or additional 76,000 Dth/d from the Alexander City compressor station to the end of the system[2][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Sabal Trail Project Phase III is a natural gas pipeline expansion in Alabama, Florida and Georgia, operated by Sabal Trail Transmission.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sabal Trail Project Phase III? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Request for extension of time to complete construction of Phase III, Sabal Trail Project (CP15-17)”. Federal Energy Regulatory Commission (eLibrary filing). 28 March 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.