Sabal Trail Project Phase III is a natural gas pipeline expansion in Alabama, Florida and Georgia, operated by Sabal Trail Transmission.

Sabal Trail Project Phase III
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusApproved[1]
CommodityNatural gas[1]
Operator
StatesAlabama, Florida, Georgia[1]
FERC docketCP15-17[1]
FERC pre-filing docketPF14-1[1]
Technical information
Capacity76 MMcf/d additional capacity (EIA)[1] or additional 76,000 Dth/d from the Alexander City compressor station to the end of the system[2][sources disagree]
On ProvenHand
Hands listed0

Sabal Trail Project Phase III is a natural gas pipeline expansion in Alabama, Florida and Georgia, operated by Sabal Trail Transmission.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 76 MMcf/d additional capacity (EIA)[1]
  • additional 76,000 Dth/d from the Alexander City compressor station to the end of the system[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabal Trail Project Phase III? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Request for extension of time to complete construction of Phase III, Sabal Trail Project (CP15-17)”. Federal Energy Regulatory Commission (eLibrary filing). 28 March 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.