Sabine Pass Liquefaction Expansion Project

From the ProvenHand pipeline wiki

Sabine Pass Liquefaction Expansion Project is a natural gas pipeline expansion, operated by Sabine Pass Liquefaction Expansion, LLC.

Sabine Pass Liquefaction Expansion Project
General information
Project typeExpansion[1]
CommodityNatural gas[2]
Owner and operator
Approved6 April 2015[2]
FERC docketCP13-552[1]
Contractors
On ProvenHand
Hands listed0

Sabine Pass Liquefaction Expansion Project is a natural gas pipeline expansion, operated by Sabine Pass Liquefaction Expansion, LLC.

Contractorsedit

ContractorWorkScope
Bechtel Oil, Gas and Chemicals, Inc.[3]PrimeEPC (lump sum turnkey) contractor for Trains 5 and 6

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabine Pass Liquefaction Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP13-552”. Federal Energy Regulatory Commission. 30 September 2013. Retrieved 3 October 2026.
  2. “Authorization to Commence Service of Train 5 Facilities, Sabine Pass Liquefaction Expansion (CP13-552)”. FERC. 12 March 2019. Retrieved 4 October 2026.
  3. “Sabine Pass Liquefaction, LLC annual report on Form 10-K for 2018”. Sabine Pass Liquefaction, LLC (SEC filing). 26 February 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.