Sabine Pass LNG Phase 2 Project

From the ProvenHand pipeline wiki

Sabine Pass LNG Phase 2 Project is a facility project, operated by Sabine Pass Lng, L.p.. It entered service in 2009.

Sabine Pass LNG Phase 2 Project
General information
KindFacility project[1]
StatusIn service[2]
Owner and operator
CountiesCameron[3]
Approved15 June 2006[3]
In service2009[2]
FERC docketCP05-396[1]
Contractors
Technical information
Capacityplanned average send-out capacity raised from 2.6 Bcf/d to 4 Bcf/d[3]
On ProvenHand
Hands listed0

Sabine Pass LNG Phase 2 Project is a facility project, operated by Sabine Pass Lng, L.p.. It entered service in 2009.

Contractorsedit

ContractorWorkScopeYears
Bechtel Corporation[4]PrimeEPCM (engineering, procurement and construction management) agreement for Phase 2 - Stage 1, the 1.4 Bcf/d expansion, signed July 2006from 1 July 2006
Remedial Construction Services, L.P.[4]soil improvement (site preparation)EPC unit-rate soil improvement contract for the Phase 2 - Stage 1 site, July 2006from 1 July 2006
Zachry Construction Corporation[4]LNG storage tank EPCEPC LNG tank contract (with Diamond LNG LLC) for the two Phase 2 - Stage 1 LNG storage tanks
Diamond LNG LLC[4]LNG storage tank EPCEPC LNG tank contract (with Zachry Construction Corporation) for the two Phase 2 - Stage 1 LNG storage tanks

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabine Pass LNG Phase 2 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP05-396”. Federal Energy Regulatory Commission. 29 July 2005. Retrieved 3 October 2026.
  2. “Cheniere Energy, Inc. Form 10-K for fiscal year 2009”. Cheniere Energy, Inc. (SEC filing). February 2010. Retrieved 4 October 2026.
  3. “Order Granting Authority under Section 3 of the Natural Gas Act, Sabine Pass LNG, L.P. (CP05-396, Phase 2 Project)”. FERC (order). 15 June 2006. Retrieved 4 October 2026.
  4. “Cheniere Energy, Inc. Form 10-K for fiscal year 2006 (Sabine Pass LNG construction agreements)”. Cheniere Energy, Inc. (SEC filing). March 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.