High Pressure Boil Off Gas Compressor Project
From the ProvenHand pipeline wiki
High Pressure Boil Off Gas Compressor Project is a natural gas facility project, operated by Sabine Pass Lng, L.p.. It entered service in 2011.
| High Pressure Boil Off Gas Compressor Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Added units[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Counties | Cameron[2] |
| Approved | 9 February 2011[2] |
| In service | 15 September 2011[3] |
| FERC docket | CP11-32[1] |
| Technical information | |
| Horsepower added | 7,800 hp[2] |
| On ProvenHand | |
| Hands listed | 0 |
High Pressure Boil Off Gas Compressor Project is a natural gas facility project, operated by Sabine Pass Lng, L.p.. It entered service in 2011.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on High Pressure Boil Off Gas Compressor Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP11-32”. Federal Energy Regulatory Commission. 12 November 2010. Retrieved 3 October 2026.
- “Order Granting Authorization under Section 3 of the Natural Gas Act, Sabine Pass LNG, L.P. (CP11-32)”. Federal Energy Regulatory Commission. 9 February 2011. Retrieved 4 October 2026.
- “Monthly Construction Progress Report No. 7 for High Pressure Boil Off Gas Compressor, September 2011 (CP11-32)”. Sabine Pass LNG, L.P. (filed with FERC). 7 October 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.