Sabine Pipe Line CP09-4
From the ProvenHand pipeline wiki
Sabine Pipe Line CP09-4 is a natural gas facility project in Louisiana, operated by Sabine Pipe Line, LLC.
| Sabine Pipe Line CP09-4 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Calcasieu[2] |
| FERC docket | CP09-4[1] |
| Technical information | |
| Capacity | receive up to 200 MMcf/d of revaporized LNG[2] |
| Cost | $293,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Sabine Pipe Line CP09-4 is a natural gas facility project in Louisiana, operated by Sabine Pipe Line, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sabine Pipe Line CP09-4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP09-4”. Federal Energy Regulatory Commission. 8 October 2008. Retrieved 3 October 2026.
- “Notice of request under blanket authorization, Sabine Pipe Line LLC (CP09-4)”. FERC. 22 October 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.