Sabine Pipe Line Line TXL0931 Project

From the ProvenHand pipeline wiki

Sabine Pipe Line Line TXL0931 Project is a pipeline lateral, operated by Sabine Pipe Line, LLC. Construction began in 2026. It runs 2.6 miles of 12" pipe.

Sabine Pipe Line Line TXL0931 Project
General information
KindPipeline project[1]
Project typeLateral[2]
StatusUnder construction[3]
Owner and operator
CountiesOrange[2]
Construction started4 June 2026[4]
FERC docketCP26-67[1]
Technical information
Length2.6 mi[2]
Pipe size12"[2]
Capacity addedup to 80,000 dekatherms per day[2]
Cost$16,288,400[2]
On ProvenHand
Hands listed0

Sabine Pipe Line Line TXL0931 Project is a pipeline lateral, operated by Sabine Pipe Line, LLC. Construction began in 2026. It runs 2.6 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabine Pipe Line Line TXL0931 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-67”. Federal Energy Regulatory Commission. 14 January 2026. Retrieved 3 October 2026.
  2. “Environmental Assessment Report for Sabine Pipe Line, L.L.C.'s Sections 157.205, 157.208, and 157.211 under CP26-67.”. Federal Energy Regulatory Commission (staff document). 12 March 2026. Retrieved 3 October 2026.
  3. “Sabine Pipe Line, LLC submits Weekly Status Report No. 17 for the period of 09/20/2026 to 09/26/2026 re the Line TXL0931 Project under CP26-67.”. Sabine Pipe Line, LLC (filed with FERC). 30 September 2026. Retrieved 3 October 2026.
  4. “Sabine Pipe Line, LLC submits Weekly Status Report No. 1 for the period of 05/31/2026 to 06/06/2026 re the Line TXL0931 Project under CP26-67.”. Sabine Pipe Line, LLC (filed with FERC). 10 June 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.