Sabinsville to Morrisville Project is a natural gas pipeline expansion in Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2013. It runs 3.6 miles of 24" pipe.

Sabinsville to Morrisville Project
Also calledSabinsville to Morrrisville Project[1]
General information
KindPipeline project[2]
Project typeExpansion[3]
StatusIn service[3]
CommodityNatural gas[3]
Owner and operator
StatePennsylvania[2][3]
CountiesTioga[4]
Approved8 March 2013[2]
In serviceNovember 2013[3]
FERC docketCP12-20[2]
Technical information
Length3.6 mi[2][3]
Pipe size24"[3]
Capacity92 MMcf/d (FERC project list)[2][3]
Cost$16.76 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

Sabinsville to Morrisville Project is a natural gas pipeline expansion in Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2013. It runs 3.6 miles of 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabinsville to Morrisville Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP12-20”. Federal Energy Regulatory Commission. 21 November 2011. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Environmental Assessment, Tioga Area Expansion and Sabinsville to Morrisville Projects (CP12-19 and CP12-20)”. FERC. 30 November 2012. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.