Saguaro Connector Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Saguaro Connector Pipeline is a natural gas pipeline in Texas, operated by Saguaro Connector Pipeline, LLC.
| Saguaro Connector Pipeline | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | Approved[1][2] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| Owner | |
| State | Texas[1][3] |
| Counties | Hudspeth[4] |
| Approved | 15 February 2024[3][4] |
| FERC docket | CP23-29[1] |
| Technical information | |
| Length | 155 mi[1][5] or 0.2 mi[3][sources disagree] |
| Pipe size | 48"[1][6] |
| Capacity | 2834 MMcf/d (FERC project list)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Saguaro Connector Pipeline is a natural gas pipeline in Texas, operated by Saguaro Connector Pipeline, LLC.
Crossings
| Feature | Method |
|---|---|
| Rio Grande (US-Mexico border)[6] | Direct pipe |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Saguaro Connector Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Granting Extension of Time Request, Saguaro Connector Pipeline, L.L.C. (CP23-29)”. Federal Energy Regulatory Commission. 28 September 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Presidential Permit and Granting Authorization Under Section 3 of the Natural Gas Act, Saguaro Connector Pipeline, L.L.C. (CP23-29)”. Federal Energy Regulatory Commission. 15 February 2024. Retrieved 3 October 2026.
- “ONEOK news release (Form 8-K, Ex. 99.1): Saguaro Connector Pipeline files permit application for border-crossing facilities”. ONEOK, Inc. 20 December 2022. Retrieved 3 October 2026.
- “Environmental Assessment, Saguaro Connector Pipeline Project (CP23-29)”. Federal Energy Regulatory Commission. 25 August 2023. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.