Salisbury Integrity Project

From the ProvenHand pipeline wiki

Salisbury Integrity Project is a pipeline loop, operated by Eastern Shore Natural Gas Company. It entered service in 2025. It runs 5.5 miles of 10" pipe.

Salisbury Integrity Project
Also calledWorcester Resiliency Upgrade - Salisbury Loop[1]
General information
KindPipeline project[2]
Project typeLoop[2][3]
StatusIn service[4]
Owner and operator
CountiesWicomico[2]
In serviceNovember 2025[4]
FERC docketCP25-136[3]
Technical information
Length5.5 mi[2]
Pipe size10"[2]
Cost$20 million[2]
On ProvenHand
Hands listed0

Salisbury Integrity Project is a pipeline loop, operated by Eastern Shore Natural Gas Company. It entered service in 2025. It runs 5.5 miles of 10" pipe.

Crossings

FeatureMethod
Brewington Branch[1]HDD
Leonard Pond Run[1]HDD
Peggy Branch[1]HDD
Wood Creek[1]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Salisbury Integrity Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Salisbury Integrity Water Quality Certification Request (24-WQC-0038)”. Maryland Department of the Environment. Retrieved 3 October 2026.
  2. “Environmental Assessment Report for Eastern Shore Natural Gas Company's Prior Notice 157.205(b), 157.208(c), and 157.210 under CP25-136.”. Federal Energy Regulatory Commission (staff document). 15 May 2025. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP25-136”. Federal Energy Regulatory Commission. 7 March 2025. Retrieved 3 October 2026.
  4. “Field Inspection Report for Eastern Shore Natural Gas' Salisbury Integrity Project, conducted on 05/28/2026 under CP25-136.”. Field Inspection Report for Eastern Shore Natural Gas' Salisbury Integrity Project, conduc (filed with FERC). 24 June 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.