Salt River Landfill Line
From the ProvenHand pipeline wiki
Salt River Landfill Line is a natural gas pipeline lateral in Arizona, operated by SRG (Saltriver Group) Inc. It entered service in 2005. It runs 3.2 miles of 12" pipe.
| Salt River Landfill Line | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Arizona[1] |
| In service | 15 December 2005[1] |
| Technical information | |
| Length | 3.2 mi[1] |
| Pipe size | 12"[1] |
| Capacity | 1.7 MMcf/d additional capacity (EIA)[1] |
| Cost | $2 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Salt River Landfill Line is a natural gas pipeline lateral in Arizona, operated by SRG (Saltriver Group) Inc. It entered service in 2005. It runs 3.2 miles of 12" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Salt River Landfill Line? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.