Santa Fe Mainline
From the ProvenHand pipeline wiki
Santa Fe Mainline is a natural gas pipeline in New Mexico, operated by New Mexico Gas. Construction began in 2020 and the line entered service in 2021. It runs 35 miles of 20" pipe.
| Santa Fe Mainline | |
|---|---|
| Also called | Santa Fe Mainline Looping Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[2] or Loop[1][sources disagree] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| State | New Mexico[2] |
| Construction started | May 2020[1] |
| In service | 26 February 2021[1][2] |
| Technical information | |
| Length | 35 mi[2] |
| Pipe size | 20"[2] |
| Cost | $60 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Santa Fe Mainline is a natural gas pipeline in New Mexico, operated by New Mexico Gas. Construction began in 2020 and the line entered service in 2021. It runs 35 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Santa Fe Mainline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Santa Fe Mainline Looping Project”. New Mexico Gas Company. Archived from the original on 7 March 2023. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.