Searcy Interconnection
From the ProvenHand pipeline wiki
Searcy Interconnection is a pipeline project, operated by Centerpoint Energy Gas Transmission. Construction began in 2008.
| Searcy Interconnection | |
|---|---|
| General information | |
| Owner and operator | |
| Counties | White[2] |
| Construction started | 10 November 2008[3] |
| FERC docket | CP08-456[1] |
| Technical information | |
| Capacity | initial peak day design capacity 125,000 Dekatherms per day[2] |
| Units added | 1 × Caterpillar G3608 (compressor package, 2,370 hp each)[2] |
| Horsepower added | 2,370 hp[2] |
| Cost | $13,213,955 (CenterPoint estimate)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Searcy Interconnection is a pipeline project, operated by Centerpoint Energy Gas Transmission. Construction began in 2008.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Searcy Interconnection? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-456”. Federal Energy Regulatory Commission. 5 August 2008. Retrieved 3 October 2026.
- “CenterPoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization (Docket No. CP08-456-000), Federal Register E8-18728”. Federal Energy Regulatory Commission (published in the Federal Register). 13 August 2008. Retrieved 4 October 2026.
- “CenterPoint Energy Gas Transmission informs FERC it commenced construction activities on 11/10/08, Searcy Interconnection (CP08-456)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 17 April 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.