Sedalia 2010 Line XT 2.0 Mile Replacement

From the ProvenHand pipeline wiki

Sedalia 2010 Line XT 2.0 Mile Replacement is a natural gas pipeline replacement in Missouri, operated by Southern Star Central Gas Pipeline, Inc.. It entered service in 2011. It runs 2 miles of 20" pipe.

Sedalia 2010 Line XT 2.0 Mile Replacement
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
CommodityNatural gas[4]
Owner and operator
StateMissouri[4]
CountiesJohnson[4]
In serviceJanuary 2011[3]
FERC docketCP10-48[2]
Technical information
Length2 mi[4]
Pipe size20"[4]
Cost$4,961,000[4]
On ProvenHand
Hands listed0

Sedalia 2010 Line XT 2.0 Mile Replacement is a natural gas pipeline replacement in Missouri, operated by Southern Star Central Gas Pipeline, Inc.. It entered service in 2011. It runs 2 miles of 20" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sedalia 2010 Line XT 2.0 Mile Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Correspondence from Department of Natural Resources re Sedalia 2010 Line XT 2.0 Mile Replacement, Southern Star Central Gas Pipeline (CP10-48)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 16 February 2010. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP10-48”. Federal Energy Regulatory Commission. 29 January 2010. Retrieved 3 October 2026.
  3. “Environmental Compliance Inspection Report, Southern Star Central Gas Pipeline, Inc. Sedalia XT replacement (CP10-48)”. FERC. 8 August 2011. Retrieved 4 October 2026.
  4. “Environmental Assessment Report, Southern Star Central Gas Pipeline, Inc. replacement of two miles of 12-inch XT pipeline (CP10-48)”. FERC. 1 March 2010. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.