SESH Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
SESH Expansion Project is a natural gas pipeline expansion, operated by Southeast Supply Header, LLC. It runs 0.8 miles.
| SESH Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility project | |
| State | LA[3] or AL, MS[2][sources disagree] |
| Counties | Copiah[5] |
| Approved | 14 August 2014[3] |
| In service | 12 November 2015[2] or 1 November 2015[5][sources disagree] |
| FERC docket | CP14-87[1] |
| Technical information | |
| Length | 0.8 mi[3] |
| Capacity | 45 MMcf/d (FERC project list)[2][3] |
| Cost | $47.8 million (EIA estimate; no dollar year given)[2] or $47,876,821 (EA cost line)[4][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
SESH Expansion Project is a natural gas pipeline expansion, operated by Southeast Supply Header, LLC. It runs 0.8 miles.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on SESH Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP14-87”. Federal Energy Regulatory Commission. 20 February 2014. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Environmental Assessment, SESH Expansion Project (CP14-87)”. Federal Energy Regulatory Commission. 4 June 2014. Retrieved 4 October 2026.
- “Notice of Commencement of Service, SESH Expansion Project (CP14-87)”. Southeast Supply Header, LLC (filed with FERC). 12 November 2015. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.