Sierrita Pima Expansion is a natural gas pipeline expansion in Arizona, operated by Sierrita Gas Pipeline. It runs 60.9 miles.

Sierrita Pima Expansion
Also calledSierrita Compressor Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1][3]
StatusIn service[3][4]
CommodityNatural gas[3][5]
Operator
Owner and operator
Facility project
StateArizona[3][5]
CountiesPima[5]
Approved1 October 2018[2][5]
In service31 March 2020[3] or 12 April 2020[4][sources disagree]
FERC docketCP18-37[2]
Technical information
Length60.9 mi[3]
Capacity323 MMcf/d additional capacity (EIA)[3]
Capacity addedup to 322,794 Dth per day of additional firm transportation service[5]
Cost$46.3 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

Sierrita Pima Expansion is a natural gas pipeline expansion in Arizona, operated by Sierrita Gas Pipeline. It runs 60.9 miles.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 31 March 2020[3]
  • 12 April 2020[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sierrita Pima Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP18-37”. Federal Energy Regulatory Commission. 5 January 2017. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Notice of Commencement of Service, Sierrita Compressor Expansion Project (CP18-37)”. Sierrita Gas Pipeline LLC (filed with FERC). 14 April 2020. Retrieved 4 October 2026.
  5. “Order Issuing Certificate and Amending Presidential Permit, Sierrita Gas Pipeline LLC, Sierrita Compressor Expansion Project (CP18-37)”. FERC. 1 October 2018. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.