Smithfield III Compressor Station Replacement
From the ProvenHand pipeline wiki
Smithfield III Compressor Station Replacement is a facility project in West Virginia, operated by Columbia Gas Transmission, LLC.
| Smithfield III Compressor Station Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[2] |
| Status | Approved[3] |
| Owner and operator | |
| State | West Virginia[1] |
| Counties | Wetzel[1] |
| FERC docket | CP15-547[2] |
| Technical information | |
| Units added | 1 × Centaur 50 (3,000 hp each)[1] |
| Cost | $25,460,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Smithfield III Compressor Station Replacement is a facility project in West Virginia, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Smithfield III Compressor Station Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Smithfield III Compressor Station Replacement (CP15-547)”. FERC. 28 September 2015. Retrieved 4 October 2026.
- “FERC eLibrary docket CP15-547”. Federal Energy Regulatory Commission. 28 August 2015. Retrieved 3 October 2026.
- “2.55(b) advance notification, horsepower replacement at Smithfield III Compressor Station (CP15-547)”. Columbia Gas Transmission, LLC (filed with FERC). 28 August 2015. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.