Smithfield III Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Smithfield III Expansion Project is a natural gas pipeline, operated by Columbia Gas Transmission, LLC. It entered service in 2014.

Smithfield III Expansion Project
Also calledWest Side Expansion Project (Smithfield III)[1]
General information
KindPipeline project[1]
Project typeReversal[2][3] or Expansion[3][4][sources disagree]
StatusIn service[2]
CommodityNatural gas[2][5]
Owner and operator
Facility projects
StatesPA, WV[1][5] or KY, PA, WV[2][sources disagree]
CountiesPennsylvania: Washington
West Virginia: Gilmer, Kanawha
[5]
Approved19 December 2013[1][5]
In service27 October 2014[2]
FERC docketsCP13-477[1], CP15-2[3]
Technical information
Capacity444 MMcf/d (FERC project list)[1][2]
Capacity addedan additional 444,000 Dth per day of firm transportation service[5]
Cost$81 million (EIA estimate; no dollar year given)[2] or approximately $81.8 million[5][sources disagree]
On ProvenHand
Hands listed0

Smithfield III Expansion Project is a natural gas pipeline, operated by Columbia Gas Transmission, LLC. It entered service in 2014.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
Cost
  • $81 million (EIA estimate; no dollar year given)[2]
  • approximately $81.8 million[5]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Smithfield III Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP15-2”. Federal Energy Regulatory Commission. 8 October 2014. Retrieved 3 October 2026.
  4. “FERC eLibrary docket CP13-477”. Federal Energy Regulatory Commission. 10 May 2013. Retrieved 3 October 2026.
  5. “Order Issuing Certificate, Columbia Gas Transmission, LLC, Smithfield III Expansion Project (CP13-477)”. FERC. 19 December 2013. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.