South Seattle Delivery Lateral Expansion is a natural gas pipeline in Washington, operated by Puget Sound Energy. It entered service in 2013. It runs 4 miles of 16" pipe.

South Seattle Delivery Lateral Expansion
General information
KindPipeline project[1]
Project typeLateral[1] or Replacement[2][sources disagree]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateWashington[1]
CountiesKing[2]
Approved10 May 2013[2]
In service26 September 2013[1]
FERC docketCP12-471[1]
Contractors
Technical information
Length4 mi[1]
Pipe size16"[1]
Capacity75 MMcf/d additional capacity (EIA)[1]
On ProvenHand
Hands listed0

South Seattle Delivery Lateral Expansion is a natural gas pipeline in Washington, operated by Puget Sound Energy. It entered service in 2013. It runs 4 miles of 16" pipe.

Contractorsedit

ContractorWorkScope
GeoEngineers, Inc.[4]geotechnical consultant (on-site slope stability and stormwater evaluation of the right-of-way)Geotechnical site inspection near MP 2.17-2.27, October 2013

Crossings

FeatureMethod
Cedar River[2]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on South Seattle Delivery Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order Issuing Certificate and Approving Abandonment, Northwest Pipeline GP, South Seattle Delivery Lateral Expansion (CP12-471)”. FERC (order). 10 May 2013. Retrieved 4 October 2026.
  3. “FERC eLibrary docket CP12-471”. Federal Energy Regulatory Commission. 4 June 2012. Retrieved 3 October 2026.
  4. “Biweekly Status Report, South Seattle Delivery Lateral Expansion Project (CP12-471), October 2013”. Northwest Pipeline LLC (filed with FERC). 16 October 2013. Retrieved 4 October 2026.