South System Expansion III Phase 3
From the ProvenHand pipeline wiki
South System Expansion III Phase 3 is a natural gas pipeline expansion in Alabama, Georgia and Mississippi, operated by Southern Natural Gas Company, L.L.C.. It entered service in 2012. It runs 19.3 miles of 36" pipe.
| South System Expansion III Phase 3 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| States | Alabama, Georgia, Mississippi[1] |
| Approved | 27 August 2009[2] |
| In service | June 2012[1] |
| FERC docket | CP09-36[1] |
| FERC pre-filing docket | PF08-13[1] |
| Technical information | |
| Length | 19.3 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 125 MMcf/d additional capacity (EIA)[1] |
| Cost | $122.6 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
South System Expansion III Phase 3 is a natural gas pipeline expansion in Alabama, Georgia and Mississippi, operated by Southern Natural Gas Company, L.L.C.. It entered service in 2012. It runs 19.3 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on South System Expansion III Phase 3? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order granting abandonment authority and issuing certificates, Southern Natural Gas South System Expansion III Project et al (CP09-36)”. Federal Energy Regulatory Commission. 27 August 2009. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.