South Texas Enhancement Project
From the ProvenHand pipeline wiki
South Texas Enhancement Project is a natural gas pipeline loop in Texas, operated by Tennessee Gas Pipeline Company, L.L.C.. It runs 1.5 miles of 30" pipe.
| South Texas Enhancement Project | |
|---|---|
| Also called | Tennessee Gas Pipeline South Texas Enhancement Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Loop[2] |
| Status | Proposed[3] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| Facility project | |
| State | Texas[3] |
| Counties | Brooks, Nueces[3] |
| FERC docket | CP26-540[1] |
| Technical information | |
| Length | 1.5 mi[2] |
| Pipe size | 30"[2] |
| Capacity added | 29,000 Dth/d of incremental capacity; about 319,000 Dth/d reallocated and created in total[2] |
| Cost | $91,808 thousand total estimated cost (Exhibit K)[2] |
| On ProvenHand | |
| Hands listed | 0 |
South Texas Enhancement Project is a natural gas pipeline loop in Texas, operated by Tennessee Gas Pipeline Company, L.L.C.. It runs 1.5 miles of 30" pipe.
Crossings
| Feature | Method |
|---|---|
| Foreign pipelines, roads and other dense infrastructure on the STEP Loop (HDD of about 0.35 mi)[2] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on South Texas Enhancement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-540”. Federal Energy Regulatory Commission. 5 June 2026. Retrieved 3 October 2026.
- “Application for a Certificate of Public Convenience and Necessity, South Texas Enhancement Project (CP26-540): application, Exhibit K and Resource Report 1”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 5 June 2026. Retrieved 3 October 2026.
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed South Texas Enhancement Project (CP26-540)”. Federal Energy Regulatory Commission. 16 July 2026. Retrieved 3 October 2026.
- “South Texas Enhancement Project”. Kinder Morgan. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.