Southeast Texas Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Southeast Texas Project is a facility project in Louisiana and Texas, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2025.
| Southeast Texas Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | In service[2] |
| Owner and operator | |
| Facility project | |
| States | Louisiana, Texas[3] |
| Counties | Louisiana: Calcasieu Texas: Orange[4] |
| Approved | 20 March 2025[3][5] |
| Construction started | April 2025[6] |
| In service | 1 October 2025[2] |
| FERC docket | CP24-510[1] |
| Technical information | |
| Capacity added | 150 MMcf/d (FERC project list)[3] or up to 150,000 million British thermal units per day of new firm transportation capacity[4][sources disagree] |
| Horsepower added | 5,000 hp[3] |
| Cost | $35,400,000[4] |
| On ProvenHand | |
| Hands listed | 0 |
Southeast Texas Project is a facility project in Louisiana and Texas, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2025.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity added |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southeast Texas Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-510”. Federal Energy Regulatory Commission. 8 August 2024. Retrieved 3 October 2026.
- “Florida Gas Transmission Company, LLC submits Final Weekly Environmental Status Report No. 47 for the period 02/22/2026 through 02/28/2026 re the Southeast Texas Project under CP24-510.”. Florida Gas Transmission Company, LLC (filed with FERC). 2 March 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report for Florida Gas Transmission Company, LLC's Sections 157.208, 157.210 and 157.211 under CP24-510.”. Federal Energy Regulatory Commission (staff document). 31 January 2025. Retrieved 3 October 2026.
- “Order Denying Protests and Authorizing Construction re Florida Gas Transmission Company, LLC's Southeast Texas Project under CP24-510.”. Federal Energy Regulatory Commission (staff document). 20 March 2025. Retrieved 3 October 2026.
- “Florida Gas Transmission Company, LLC submits Weekly Environmental Status Report No. 1 for the period of 04/06/2025 to 04/12/2025 re the Southeast Texas Project under CP24-510.”. Florida Gas Transmission Company, LLC (filed with FERC). 17 April 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.