Southeast Texas Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Southeast Texas Project is a facility project in Louisiana and Texas, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2025.

Southeast Texas Project
General information
KindFacility project[1]
StatusIn service[2]
Owner and operator
Facility project
StatesLouisiana, Texas[3]
CountiesLouisiana: Calcasieu
Texas: Orange
[4]
Approved20 March 2025[3][5]
Construction startedApril 2025[6]
In service1 October 2025[2]
FERC docketCP24-510[1]
Technical information
Capacity added150 MMcf/d (FERC project list)[3] or up to 150,000 million British thermal units per day of new firm transportation capacity[4][sources disagree]
Horsepower added5,000 hp[3]
Cost$35,400,000[4]
On ProvenHand
Hands listed0

Southeast Texas Project is a facility project in Louisiana and Texas, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2025.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity added
  • 150 MMcf/d (FERC project list)[3]
  • up to 150,000 million British thermal units per day of new firm transportation capacity[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Southeast Texas Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-510”. Federal Energy Regulatory Commission. 8 August 2024. Retrieved 3 October 2026.
  2. “Florida Gas Transmission Company, LLC submits Final Weekly Environmental Status Report No. 47 for the period 02/22/2026 through 02/28/2026 re the Southeast Texas Project under CP24-510.”. Florida Gas Transmission Company, LLC (filed with FERC). 2 March 2026. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Environmental Assessment Report for Florida Gas Transmission Company, LLC's Sections 157.208, 157.210 and 157.211 under CP24-510.”. Federal Energy Regulatory Commission (staff document). 31 January 2025. Retrieved 3 October 2026.
  5. “Order Denying Protests and Authorizing Construction re Florida Gas Transmission Company, LLC's Southeast Texas Project under CP24-510.”. Federal Energy Regulatory Commission (staff document). 20 March 2025. Retrieved 3 October 2026.
  6. “Florida Gas Transmission Company, LLC submits Weekly Environmental Status Report No. 1 for the period of 04/06/2025 to 04/12/2025 re the Southeast Texas Project under CP24-510.”. Florida Gas Transmission Company, LLC (filed with FERC). 17 April 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.