2006 Abandonment and Replacement Project
From the ProvenHand pipeline wiki
2006 Abandonment and Replacement Project is a natural gas pipeline replacement in Alabama, operated by Southern Natural Gas Company, L.L.C.. It was built and entered service in 2006. It runs 6.1 miles of 24" pipe.
| 2006 Abandonment and Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Alabama[1][2] |
| Counties | Tuscaloosa[2] |
| Approved | 14 July 2006[1][2] |
| Construction started | 9 August 2006[4] |
| In service | 9 November 2006[3] |
| FERC docket | CP06-58[1] |
| Technical information | |
| Length | 6.1 mi[1][2] |
| Pipe size | 24"[2] |
| Cost | approximately $8.4 million (replacement pipeline)[2] |
| On ProvenHand | |
| Hands listed | 0 |
2006 Abandonment and Replacement Project is a natural gas pipeline replacement in Alabama, operated by Southern Natural Gas Company, L.L.C.. It was built and entered service in 2006. It runs 6.1 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 2006 Abandonment and Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment, Southern Natural Gas Company (CP06-58)”. FERC. 14 July 2006. Retrieved 4 October 2026.
- “Notice of Completion of Construction and In-Service on 11/09/06 (CP06-58), eLibrary filing description”. Southern Natural Gas Company (filed with FERC). 14 November 2006. Retrieved 4 October 2026.
- “Notice that construction of the authorized facilities commenced on 8/9/06 (CP06-58), eLibrary filing description”. Southern Natural Gas Company (filed with FERC). 16 August 2006. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.