Southern Natural Gas North System Expansion 2 Project
From the ProvenHand pipeline wiki
Southern Natural Gas North System Expansion 2 Project is a natural gas pipeline expansion in Alabama and Mississippi, operated by Southern Natural Gas Company, L.L.C.. It runs 4.5 miles of 24" pipe.
| Southern Natural Gas North System Expansion 2 Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | Announced[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Alabama, Mississippi[2][4] |
| Counties | Alabama: Limestone, Madison, Pickens Mississippi: Lowndes[2] |
| Approved | 16 September 2026[4] |
| FERC docket | CP26-567[1] |
| Technical information | |
| Length | 4.5 mi[2][3][4] |
| Pipe size | 24"[2] |
| Field-joint coating | liquid epoxy[2] |
| Capacity | 10.5 MMcf/d (FERC project list)[4] |
| Cost | approximately $28 million (SNG estimate of total project cost)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Southern Natural Gas North System Expansion 2 Project is a natural gas pipeline expansion in Alabama and Mississippi, operated by Southern Natural Gas Company, L.L.C.. It runs 4.5 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southern Natural Gas North System Expansion 2 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-567”. Federal Energy Regulatory Commission. 21 August 2026. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate of Public Convenience and Necessity and Environmental Report, North System Expansion 2 Project (CP26-567)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 21 August 2026. Retrieved 3 October 2026.
- “Notice of Withdrawal of Application, North System Expansion 2 Project (CP26-567)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 1 September 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.