Southern Natural Gas South System 2022 Project
From the ProvenHand pipeline wiki
Southern Natural Gas South System 2022 Project is a natural gas pipeline expansion in Alabama and Georgia, operated by Southern Natural Gas Company, L.L.C.. It was built and entered service in 2022. It runs 3 miles of 36" pipe.
| Southern Natural Gas South System 2022 Project | |
|---|---|
| Also called | South System 2022 Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1][3] |
| Owner and operator | |
| States | Alabama, Georgia[1] |
| Counties | Hale, Marengo[3] |
| Construction started | 6 May 2022[4] |
| In service | 20 November 2022[1] |
| FERC docket | CP22-23[2] |
| Technical information | |
| Length | 3 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 25.5 MMcf/d additional capacity (EIA)[1] |
| Capacity added | 25,500 dekatherms per day[3] |
| Cost | $14.3 million (EIA estimate; no dollar year given)[1] or $14,000,000[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Southern Natural Gas South System 2022 Project is a natural gas pipeline expansion in Alabama and Georgia, operated by Southern Natural Gas Company, L.L.C.. It was built and entered service in 2022. It runs 3 miles of 36" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southern Natural Gas South System 2022 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP22-23”. Federal Energy Regulatory Commission. 2 December 2021. Retrieved 3 October 2026.
- “Southern Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline (CP22-23)”. Federal Energy Regulatory Commission (Federal Register notice). 16 December 2021. Retrieved 4 October 2026.
- “Environmental weekly progress report no. 1, SNG South System 2022 Project (CP22-23)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 13 May 2022. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.