Southern Pines Florida/Transco Line
From the ProvenHand pipeline wiki
Southern Pines Florida/Transco Line is a natural gas pipeline in Alabama and Mississippi, operated by SGR Holding Corporation. It entered service in 2008. It runs 26 miles of 24" pipe.
| Southern Pines Florida/Transco Line | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| States | Alabama, Mississippi[1] |
| In service | 15 November 2008[1] |
| FERC docket | CP02-229[1] |
| Technical information | |
| Length | 26 mi[1] |
| Pipe size | 24"[1] |
| Capacity | 1000 MMcf/d additional capacity (EIA)[1] |
| Cost | $52 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Southern Pines Florida/Transco Line is a natural gas pipeline in Alabama and Mississippi, operated by SGR Holding Corporation. It entered service in 2008. It runs 26 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southern Pines Florida/Transco Line? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.