Southern Star Central Gas Pipeline CP14-530

From the ProvenHand pipeline wiki

Southern Star Central Gas Pipeline CP14-530 is a natural gas pipeline replacement in Missouri, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2014. It runs 6 miles of 20" pipe.

Southern Star Central Gas Pipeline CP14-530
General information
KindPipeline project[1]
Project typeReplacement[1][2]
CommodityNatural gas[2]
Owner and operator
StateMissouri[2]
CountiesJohnson[2]
Construction startedOctober 2014[3]
FERC docketCP14-530[1]
Technical information
Length6 mi[2]
Pipe size20"[2]
On ProvenHand
Hands listed0

Southern Star Central Gas Pipeline CP14-530 is a natural gas pipeline replacement in Missouri, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2014. It runs 6 miles of 20" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Southern Star Central Gas Pipeline CP14-530? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP14-530”. Federal Energy Regulatory Commission. 6 August 2014. Retrieved 3 October 2026.
  2. “Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization (CP14-530)”. Federal Energy Regulatory Commission (Federal Register notice). 20 August 2014. Retrieved 4 October 2026.
  3. “Environmental inspection weekly report no. 1, replace pipe on Sedalia Line XT (CP14-530)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 27 October 2014. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.