Southern Star Central Gas Pipeline CP14-530
From the ProvenHand pipeline wiki
Southern Star Central Gas Pipeline CP14-530 is a natural gas pipeline replacement in Missouri, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2014. It runs 6 miles of 20" pipe.
| Southern Star Central Gas Pipeline CP14-530 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Missouri[2] |
| Counties | Johnson[2] |
| Construction started | October 2014[3] |
| FERC docket | CP14-530[1] |
| Technical information | |
| Length | 6 mi[2] |
| Pipe size | 20"[2] |
| On ProvenHand | |
| Hands listed | 0 |
Southern Star Central Gas Pipeline CP14-530 is a natural gas pipeline replacement in Missouri, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2014. It runs 6 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southern Star Central Gas Pipeline CP14-530? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP14-530”. Federal Energy Regulatory Commission. 6 August 2014. Retrieved 3 October 2026.
- “Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization (CP14-530)”. Federal Energy Regulatory Commission (Federal Register notice). 20 August 2014. Retrieved 4 October 2026.
- “Environmental inspection weekly report no. 1, replace pipe on Sedalia Line XT (CP14-530)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 27 October 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.