Southern Star Central Gas Pipeline CP17-218
From the ProvenHand pipeline wiki
Southern Star Central Gas Pipeline CP17-218 is a natural gas pipeline replacement in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2017. It runs 6.8 miles of 20" pipe.
| Southern Star Central Gas Pipeline CP17-218 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Oklahoma[2] |
| Counties | Logan, Noble[2] |
| Construction started | June 2017[3] |
| FERC docket | CP17-218[1] |
| Technical information | |
| Length | 6.8 mi[2] |
| Pipe size | 20"[2] |
| On ProvenHand | |
| Hands listed | 0 |
Southern Star Central Gas Pipeline CP17-218 is a natural gas pipeline replacement in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2017. It runs 6.8 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southern Star Central Gas Pipeline CP17-218? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP17-218”. Federal Energy Regulatory Commission. 21 April 2017. Retrieved 3 October 2026.
- “Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization (CP17-218)”. Federal Energy Regulatory Commission (Federal Register notice). 5 May 2017. Retrieved 4 October 2026.
- “Environmental inspector's weekly report no. 1, Line V Replacement Project (CP17-218)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 10 July 2017. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.