Southwest Alabama Project
From the ProvenHand pipeline wiki
Southwest Alabama Project is a natural gas pipeline expansion in Alabama and Mississippi, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2022.
| Southwest Alabama Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| States | Alabama, Mississippi[2] |
| Counties | Mobile[3] |
| Approved | 8 January 2022[4] |
| Construction started | 8 January 2022[4] |
| In service | 12 January 2022[2][5] |
| FERC docket | CP22-13[1] |
| Technical information | |
| Capacity | 100 MMcf/d additional capacity (EIA)[2] |
| Horsepower added | 3,200 hp[6] |
| Cost | $2.2 million (EIA estimate; no dollar year given)[2][3] |
| On ProvenHand | |
| Hands listed | 0 |
Southwest Alabama Project is a natural gas pipeline expansion in Alabama and Mississippi, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2022.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Southwest Alabama Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-13”. Federal Energy Regulatory Commission. 28 October 2021. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Environmental Assessment Report, Southwest Alabama Project (CP22-13)”. Federal Energy Regulatory Commission. 7 January 2022. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 1, Southwest Alabama Project (CP22-13)”. Florida Gas Transmission Company, LLC (filed with FERC). 13 January 2022. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 2 (final), Southwest Alabama Project (CP22-13)”. Florida Gas Transmission Company, LLC (filed with FERC). 19 January 2022. Retrieved 3 October 2026.
- “Prior Notice Request for Authorization, Southwest Alabama Project (CP22-13)”. Florida Gas Transmission Company, LLC (filed with FERC). 28 October 2021. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.