SSTAR Southwest Missouri Expansion Proj
From the ProvenHand pipeline wiki
SSTAR Southwest Missouri Expansion Proj is a natural gas pipeline lateral in Kansas and Missouri. It entered service in 2004. It runs 15.7 miles of 20" pipe.
| SSTAR Southwest Missouri Expansion Proj | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| States | Kansas, Missouri[1] |
| In service | October 2004[1] |
| FERC docket | CP02-416[1] |
| Technical information | |
| Length | 15.7 mi[1] |
| Pipe size | 20"[1] |
| Capacity | 66.8 MMcf/d additional capacity (EIA)[1] |
| Cost | $10.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
SSTAR Southwest Missouri Expansion Proj is a natural gas pipeline lateral in Kansas and Missouri. It entered service in 2004. It runs 15.7 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on SSTAR Southwest Missouri Expansion Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.