St. Charles Transportation Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
St. Charles Transportation Project is a natural gas pipeline expansion in Maryland and Virginia, operated by Dominion Cove Point LNG, LP. Construction began in 2015.
| St. Charles Transportation Project | |
|---|---|
| Also called | St. Charles Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| States | Maryland, Virginia[1][2] |
| Counties | Maryland: Charles Virginia: Fairfax[4] |
| Approved | 20 October 2015[1] |
| Construction started | December 2015[5] |
| In service | 27 May 2016[2] or 1 June 2016[3][sources disagree] |
| FERC docket | CP15-22[1] |
| Technical information | |
| Capacity | 132 MMcf/d (FERC project list)[1][2] |
| Cost | $31 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
St. Charles Transportation Project is a natural gas pipeline expansion in Maryland and Virginia, operated by Dominion Cove Point LNG, LP. Construction began in 2015.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on St. Charles Transportation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notification of In-Service, St. Charles Transportation Project (CP15-22)”. Dominion Cove Point LNG, LP (filed with FERC). 7 June 2016. Retrieved 4 October 2026.
- “Order Issuing Certificates, Dominion Cove Point LNG, LP, Keys Energy Project (CP15-24; CP15-22 et al.)”. FERC. 20 October 2015. Retrieved 3 October 2026.
- “Monthly Environmental Status Report (December 2015), St. Charles Transportation and Keys Energy Projects (CP15-22, CP15-24)”. Dominion Cove Point LNG, LP (filed with FERC). 12 January 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.