St. James Supply Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

St. James Supply Project is a natural gas pipeline lateral in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2018. It runs 0.7 miles of 20" pipe.

St. James Supply Project
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Owner and operator
StateLouisiana[1][2]
CountiesSt. James[4]
Approved18 January 2018[1]
Construction started29 March 2018[5]
In service2 April 2019[2] or 1 April 2019[3][sources disagree]
FERC docketCP17-58[1]
Technical information
Length0.7 mi[1][2]
Pipe size20"[2]
Capacity161.5 MMcf/d (FERC project list)[1] or 162 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$33.5 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

St. James Supply Project is a natural gas pipeline lateral in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2018. It runs 0.7 miles of 20" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 161.5 MMcf/d (FERC project list)[1]
  • 162 MMcf/d additional capacity (EIA)[2]
In service
  • 2 April 2019[2]
  • 1 April 2019[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on St. James Supply Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notification of Placement into Service, St. James Supply Project (CP17-58)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 2 April 2019. Retrieved 3 October 2026.
  4. “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
  5. “Bi-weekly status report (March 29 - April 2018), St. James Supply Project (CP17-58)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 16 April 2018. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.