St. Petersburg Relay Replacement Project is a pipeline replacement, operated by Florida Gas Transmission Company, LLC. Construction began in 2007 and the line entered service in 2009. It runs 6.6 miles of 12" pipe.
| St. Petersburg Relay Replacement Project | |
|---|---|
| Also called | 12-inch St. Petersburg Replacement Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[3][4] |
| Status | In service[1] |
| Owner and operator | |
| Counties | Pinellas[4] |
| Approved | 4 May 2007[4] |
| Construction started | 25 June 2007[5] |
| In service | 31 March 2009[1] |
| FERC docket | CP06-429[3] |
| Technical information | |
| Length | 6.6 mi[4] |
| Pipe size | 12"[4] |
| Cost | approximately $19,987,000 (Florida Gas estimate)[4] |
| On ProvenHand | |
| Hands listed | 0 |
St. Petersburg Relay Replacement Project is a pipeline replacement, operated by Florida Gas Transmission Company, LLC. Construction began in 2007 and the line entered service in 2009. It runs 6.6 miles of 12" pipe.
Crossings
| Feature | Method |
|---|---|
| Bay Arbor Boulevard[6] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on St. Petersburg Relay Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notification of Commencement of Service, 12-inch St. Petersburg Replacement Project, Florida Gas Transmission Company, LLC (CP06-429)”. Florida Gas Transmission Company, LLC (filed with FERC). 9 April 2009. Retrieved 4 October 2026.
- “Florida Gas Transmission Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed St. Petersburg Relay Replacement Project and Request for Comments on Environmental Issues (Docket No. CP06-429-000), Federal Register E7-1173”. Federal Energy Regulatory Commission (published in the Federal Register). 26 January 2007. Retrieved 4 October 2026.
- “FERC eLibrary docket CP06-429”. Federal Energy Regulatory Commission. 8 August 2006. Retrieved 3 October 2026.
- “Order Denying Protest, Granting Abandonment and Issuing Certificate, Florida Gas Transmission Company (CP06-429), 119 FERC 61,122”. Federal Energy Regulatory Commission (order). 4 May 2007. Retrieved 4 October 2026.
- “Florida Gas Transmission notifies the Commission that construction activities commenced on 6/25/07, 12-inch St. Petersburg Replacement Project (CP06-429)”. Florida Gas Transmission Company (filed with FERC). 26 June 2007. Retrieved 4 October 2026.
- “Letter order approving FGT request to horizontally directionally drill under Bay Arbor Boulevard on Segment 1, St. Petersburg Replacement Project (CP06-429)”. Federal Energy Regulatory Commission (letter order). 17 September 2007. Retrieved 4 October 2026.