Station 170 Clean Air Project is a natural gas facility project in Virginia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2005 and the facility entered service in 2006.

Station 170 Clean Air Project
General information
KindFacility project[1]
StatusIn service[2]
CommodityNatural gas[1]
Owner and operator
StateVirginia[3]
CountiesAppomattox[1]
Approved19 April 2005[1][3]
Construction started24 August 2005[4]
In service21 November 2006[2]
FERC docketCP05-37[3]
Technical information
Cost$34.4 million[1]
On ProvenHand
Hands listed0

Station 170 Clean Air Project is a natural gas facility project in Virginia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2005 and the facility entered service in 2006.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Station 170 Clean Air Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Order Issuing Certificate, Transcontinental Gas Pipe Line Corporation, Station 170 Clean Air Project (CP05-37)”. FERC. 19 April 2005. Retrieved 4 October 2026.
  2. “Notice that the Station 170 Clean Air Project facilities were placed in service 11/21/06 (CP05-37), eLibrary entry”. Transcontinental Gas Pipe Line Corporation (filed with FERC). 28 November 2006. Retrieved 4 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Notice that construction of the Station 170 Clean Air Project commenced 8/24/05 (CP05-37), eLibrary entry”. Transcontinental Gas Pipe Line Corporation (filed with FERC). 13 September 2005. Retrieved 4 October 2026.