Station 50 HP Replacement Project

From the ProvenHand pipeline wiki

Station 50 HP Replacement Project is a facility project in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2006.

Station 50 HP Replacement Project
General information
KindFacility project[1]
Project typeAdded units[2]
StatusIn service[3]
Owner and operator
StateLouisiana[1]
Approved6 February 2006[1][4]
In service21 November 2006[3]
FERC docketCP06-16[1]
Technical information
Horsepower added10,310 hp[1]
On ProvenHand
Hands listed0

Station 50 HP Replacement Project is a facility project in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2006.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Station 50 HP Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP06-16”. Federal Energy Regulatory Commission. 31 October 2005. Retrieved 3 October 2026.
  3. “Transco notice that the authorized facilities were placed in service on 11/21/06 (CP06-16)”. Transcontinental Gas Pipe Line Corporation (filed with FERC). 30 November 2006. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, Transcontinental Gas Pipe Line Corporation, Station 50 Horsepower Replacement (CP06-16)”. FERC. 6 February 2006. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.