Stony Point Anomaly Metro-North Railroad Crossing Project

From the ProvenHand pipeline wiki

Stony Point Anomaly Metro-North Railroad Crossing Project is a natural gas pipeline replacement in New York, operated by Algonquin Gas Transmission, LLC. Construction began in 2021. It runs 0.1 miles of 26" pipe.

Stony Point Anomaly Metro-North Railroad Crossing Project
Also calledStoney Point Anomaly Metro-North Railroad Crossing Project[1]
General information
KindPipeline project[2]
Project typeReplacement[1]
StatusIn service[2]
CommodityNatural gas[1]
Owner and operator
StateNew York[1]
CountiesPutnam[1]
Approved27 February 2021[2]
Construction started15 March 2021[2]
FERC docketCP21-20[3]
Technical information
Length0.1 mi[1]
Pipe size26"[1]
Cost$12,500,000 (cost stated in FERC staff EA)[1]
On ProvenHand
Hands listed0

Stony Point Anomaly Metro-North Railroad Crossing Project is a natural gas pipeline replacement in New York, operated by Algonquin Gas Transmission, LLC. Construction began in 2021. It runs 0.1 miles of 26" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Stony Point Anomaly Metro-North Railroad Crossing Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Stoney Point Anomaly Metro-North Railroad Crossing Project (CP21-20)”. FERC. 26 February 2021. Retrieved 3 October 2026.
  2. “Weekly Environmental Status Report No. 64, final (June 20 to 26, 2022), Stony Point Anomaly - Metro-North Railroad Crossing Project (CP21-20)”. Algonquin Gas Transmission, LLC (filed with FERC). 7 July 2022. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP21-20”. Federal Energy Regulatory Commission. 18 December 2020. Retrieved 3 October 2026.