Strasburg Compressor Station Replacement
From the ProvenHand pipeline wiki
Strasburg Compressor Station Replacement is a facility project in Virginia, operated by Columbia Gas Transmission, LLC.
| Strasburg Compressor Station Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[2] |
| Status | Approved[1] |
| Owner and operator | |
| State | Virginia[3] |
| Counties | Shenandoah[3] |
| FERC docket | CP14-124[2] |
| Technical information | |
| Units added | 1 × Solar Titan 130 (17,800 hp each)[3] |
| Cost | $39,000,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Strasburg Compressor Station Replacement is a facility project in Virginia, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Strasburg Compressor Station Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Advance notification of natural gas facility replacement (Section 2.55(b)), Strasburg Compressor Station Replacement (CP14-124)”. Columbia Gas Transmission, LLC (filed with FERC). 28 March 2014. Retrieved 4 October 2026.
- “FERC eLibrary docket CP14-124”. Federal Energy Regulatory Commission. 28 March 2014. Retrieved 3 October 2026.
- “Environmental Assessment Report, Strasburg Compressor Station Replacement (CP14-124)”. FERC. 25 April 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.