Stratton Ridge Expansion is a natural gas pipeline expansion in Louisiana and Texas, operated by Texas Eastern Transmission, LP. Construction began in 2018.
| Stratton Ridge Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Owners and operators | |
| Operator | |
| Facility project | |
| States | Louisiana, Texas[2] |
| Counties | Brazoria, Chambers, San Jacinto, Shelby[6] |
| Approved | 6 April 2018[1][6] |
| Construction started | 1 May 2018[7] |
| In service | 22 March 2019[2] or 18 March 2019[3][sources disagree] |
| FERC dockets | CP17-56[1], CP17-57[1] |
| Technical information | |
| Pipe size | 30"[6] |
| Capacity | 500 MMcf/d additional capacity (EIA)[2] |
| Capacity added | 322,000 Dth/day of firm transportation service[6] |
| Cost | $200 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Stratton Ridge Expansion is a natural gas pipeline expansion in Louisiana and Texas, operated by Texas Eastern Transmission, LP. Construction began in 2018.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Stratton Ridge Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Stratton Ridge Expansion Project (CP17-56)”. Texas Eastern Transmission, LP (filed with FERC). 22 March 2019. Retrieved 4 October 2026.
- “FERC eLibrary docket CP17-57”. Federal Energy Regulatory Commission. 3 February 2017. Retrieved 3 October 2026.
- “FERC eLibrary docket CP17-56”. Federal Energy Regulatory Commission. 3 February 2017. Retrieved 3 October 2026.
- “Order Issuing Certificates, Texas Eastern Transmission, LP and Brazoria Interconnector Gas Pipeline LLC, Stratton Ridge Expansion Project (CP17-56, CP17-57)”. Federal Energy Regulatory Commission. 6 April 2018. Retrieved 4 October 2026.
- “Monthly Status Report No. 1, Stratton Ridge Expansion Project (CP17-56)”. Texas Eastern Transmission, LP (filed with FERC). 23 May 2018. Retrieved 4 October 2026.