Summerlin Pipe Replacement Project
From the ProvenHand pipeline wiki
Summerlin Pipe Replacement Project is a natural gas pipeline replacement in Nevada, operated by Kern River Gas Transmission Company. It entered service in 2016. It runs 1.6 miles of 36" pipe.
| Summerlin Pipe Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Nevada[3] |
| Counties | Clark[3] |
| Approved | 17 December 2015[3] |
| In service | 26 June 2016[2] |
| FERC docket | CP15-132[1] |
| Technical information | |
| Length | 1.6 mi[3] |
| Pipe size | 36"[3] |
| Cost | $10.4 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
Summerlin Pipe Replacement Project is a natural gas pipeline replacement in Nevada, operated by Kern River Gas Transmission Company. It entered service in 2016. It runs 1.6 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Summerlin Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP15-132”. Federal Energy Regulatory Commission. 26 March 2015. Retrieved 3 October 2026.
- “Notice of In-service, Summerlin Pipe Replacement Project (CP15-132)”. Kern River Gas Transmission Company (filed with FERC). 30 June 2016. Retrieved 4 October 2026.
- “Order Issuing Certificate and Granting Abandonment Authority, Kern River Gas Transmission Company, Summerlin Pipe Replacement Project (CP15-132)”. FERC. 17 December 2015. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.