Sunrise Pipeline System Expansion
From the ProvenHand pipeline wiki
Sunrise Pipeline System Expansion is a crude oil pipeline expansion in Texas, operated by Plains All American Pipeline. It runs 180 miles of 24" pipe.
| Sunrise Pipeline System Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Commodity | Crude oil[2] |
| Operator | |
| Owner | |
| State | Texas[1] |
| Contractors | |
| Technical information | |
| Length | 180 mi[1] |
| Pipe size | 24"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Sunrise Pipeline System Expansion is a crude oil pipeline expansion in Texas, operated by Plains All American Pipeline. It runs 180 miles of 24" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Holloman Corporation[1] | Prime | Listed 2019 as a pipeline construction contractor (with Holloman and Energy Services South) |
| Energy Services South LLC[1] | Prime | Listed 2019 as a pipeline construction contractor (with Holloman and Energy Services South) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sunrise Pipeline System Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Ongoing Projects: Construction Underway (Pipeline News, March 2019)”. Pipeline News. March 2019. Retrieved 3 October 2026.
- “Valero Energy first-quarter 2018 earnings release (Form 8-K exhibit)”. Valero Energy Corporation (filed with the SEC). 26 April 2018. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.