Sunrise Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Sunrise Project is a natural gas pipeline in Pennsylvania and West Virginia, operated by Equitrans, L.P.. It entered service in 2012.
| Sunrise Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Pennsylvania, West Virginia[1][2] |
| Approved | 21 July 2011[1] |
| In service | 19 July 2012[2] |
| FERC docket | CP11-68[1] |
| FERC pre-filing docket | PF10-19[1] |
| Contractors | |
| Technical information | |
| Length | 47 mi[1] or 50 mi[2][sources disagree] |
| Pipe size | 16", 20", 24"[2] |
| Capacity | 313.6 MMcf/d (FERC project list)[1] or 313.56 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $272 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Sunrise Project is a natural gas pipeline in Pennsylvania and West Virginia, operated by Equitrans, L.P.. It entered service in 2012.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Precision Pipeline, LLC[3] | Prime | Listed on the firm's past-projects page as EQT's Sunrise Project, 42 miles of 24-inch pipe |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sunrise Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Past Projects (archived 2013-10-14)”. Precision Pipeline, LLC. Archived from the original on 14 October 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.